Power

With brains, brawn, and sheer determination, we make life easier for our partners in construction. Our teams have seen it all. We have successfully delivered projects in petroleum refineries, liquefied natural gas projects, power plants, ethanol plants, nuclear facilities, and specialized manufacturing facilities. We have the ability to look at a project and truly understand the complexity of each unique structure. To increase efficiency, to maintain availability, and to reduce environmental impact.

Waste Solidification Building height=

Waste Solidification Building

The Waste Solidification Building (WSB) is being constructed to the Department of Energy's highest quality standards, Nuclear Quality Assurance Level One. WSB is one of three critical facilities ...
Ralls Wind Farm height=

Ralls Wind Farm

This project located in Ralls, Texas will utilize the first Sany 2.0MW wind turbines in the United States.
SRNS P&R Area Reactor Infill height=

SRNS P&R Area Reactor Infill

Baker's scope on the SRNS Reactor Infills includes the filling of two reactors, P and R, located on the Savannah River Nuclear Site in Aiken, SC. Each reactor required roughly 98,000 cy of contro ...
National Enrichment Facility Bunker height=

National Enrichment Facility Bunker

The $1.5 billion National Enrichment Facility (NEF) in Southeastern New Mexico is the first major nuclear facility to be licensed in the United States in nearly three decades and the first to be award ...
Taloga Wind Farm height=

Taloga Wind Farm

This Edison Mission Energy project located in Dewey County utilized 54-Mitsubishi 2.4 MW turbines.
Mixed Oxide Fuel Facility height=

Mixed Oxide Fuel Facility

Helping to maintain world peace is part of the purpose of the Mixed Oxide Fuel Fabrication Facility at the Department of Energy's Savannah River Site in Aiken, South Carolina. The $4.8 billion facilit ...
Chilean LNG Project height=

Chilean LNG Project

Baker offers its clients many services, one of which is consulting. Baker sent experts in the construction of LNG tanks to Chile to provide design and value engineering input on the construction of th ...
Lubbock Wind Project height=

Lubbock Wind Project

Installation of Samsung's 2.5 MW "proto-type" wind turbines took place in Lubbock, Texas.
Golden Pass LNG height=

Golden Pass LNG

Located in Sabine Pass, Texas, Golden Pass LNG Terminal was developed to meet the rising demand for an energy source that is safe, long-term, and dependable. Once completed, the Golden Pass LNG projec ...
Cameron LNG height=

Cameron LNG

The Cameron Liquefied National Gas (LNG) terminal is one of the first new terminals built in the United States in nearly 30 years. Baker was awarded the structural concrete contract for three massive ...
AEP Cardinal Power Plant Flue Gas Desulphurization height=

AEP Cardinal Power Plant Flue Gas Desulphurization

With the ever-growing demand of electricity, it is becoming increasingly important to ensure that it is produced responsibly. American Electric Power's (AEP) enhancement to the Cardinal Power Plant in ...
 

Contact Us | Legal | En Español | Baker Store

© 2012 Baker Concrete Construction, Inc. All rights reserved