|
|
Nuclear
With a culture that thrives on challenges and takes pride in the success of its coworkers and clients, Baker has become an industry leader that goes beyond the expected and brings the same drive, enthusiasm, and innovative spirit to every project.
Baker has a fully-audited NQA-1 program and a strong bench of highly experienced, hands-on professionals to tackle some of the world's most complex structures. This highly educated workforce is equipped with the training and experience to reduce risk and improve performance. We maintain stringent standards that contribute to the safe, reliable, and efficient utilization of nuclear, fossil fuel, and renewable energy, and we are involved in the critical processes for ensuring adherence to construction regulations.
 |
The Waste Solidification Building (WSB) is being constructed to the Department of Energy's highest quality standards, Nuclear Quality Assurance Level One. WSB is one of three critical facilities ...  |
 |
Baker's scope on the SRNS Reactor Infills includes the filling of two reactors, P and R, located on the Savannah River Nuclear Site in Aiken, SC. Each reactor required roughly 98,000 cy of contro ...  |
 |
The $1.5 billion National Enrichment Facility (NEF) in Southeastern New Mexico is the first major nuclear facility to be licensed in the United States in nearly three decades and the first to be award ... |
 |
Helping to maintain world peace is part of the purpose of the Mixed Oxide Fuel Fabrication Facility at the Department of Energy's Savannah River Site in Aiken, South Carolina. The $4.8 billion facilit ... |
|
|